Join Yellowcake's Email Updates
Email:

Juniper

The Juniper Ridge project is located in the Poison Basin uranium district in the south central area of Wyoming, close to the Colorado border. The total acreage of the property is 3,200 acres and over 2000 historical drill holes have been drilled on the project to verify the resource. One area of interest within the Juniper Ridge project is the Browns Park Formation which is 100's of feet thick.

The roughly 2000 historical drill holes have been drilled between 100 and 300 feet in depth, and have shown an average grade of between 0.05% and 0.20%. This grade is economical for ISR mining, and Yellowcake is in the process of confirming all historical data, to be able to proceed with the mining process.

Images (click to enlarge)

 


Home | About Us | Juniper | Beck | Uranium Mining | Press Releases | Contact
© 2007 Yellowcake Mining - All Rights Reserved
 

Current Press Release

[Jul 21, 2008]
Yellowcake Mining Begins First Phase Drill Program

[May 15, 2008]
Yellowcake Mining Inc. Signs Memorandum of Understanding with Korean Electric Power Corporation (KEPCO)

[May 8, 2008]
Yellowcake Mining Inc. Acquires Valuable Drill Hole Data Base at Uravan-Beck Project.

SHARE INFO:
 

YCKM.OB
Last Trade: 0.29
Change: 0.02 (7.41%)
Day High: 0.29
Day Low: 0.29
Volume: 1500